国产免费99久久精品_港台三级视频二区色多多jizz_翁熄粗大撞击娇嫩BD高清_年轻人手机在线观看日本人妖_免费影视大全_国内精品自线一区二区2021_日韩欧美成人影视中文字幕_在线播放国产精品第二页_欧美福利的日韩片_高攀1∨1H高笔趣阁

Baihetan-Jiangsu
The Baihetan-Jiangsu UHV Project

Winning bid products: bridge arm reactor, filter group reactor

 

Filter group reactorYucheng converter station

 

Operation year: 2022

 

The Baihetan-Jiangsu UHV project was approved and ratified by National Development and Reform Commission (NDRC) in November, with a total investment of about 30 billion RMB, and planned to be completed in 2022. The project starts from Baihetan converter station in Liangshan Prefecture, Sichuan Province, and ends at Yucheng converter station in Suzhou, Jiangsu Province, with a total path length of 2,087 kilometers, passing through 5 provinces, 19 cities and 59 counties, and requiring four major crossings of the Yibin Minjiang River in Sichuan Province, the Yangtze River in Chongqing, the Hanjiang River in Zhongxiang, Hubei Province, and the Yangtze River in Ma'anshan, Anhui Province, and so on, and the end of Yucheng converter station will be the first time that a mixed conventional and flexible DC technology has been applied in the world's DC power transmission field. Cascade technology. Transmission capacity of 8 million kilowatts, after completion of the annual power transmission to the provincial power grid 31.2 billion kilowatt-hours.